REHABILITATION OF 6 HPP IN MACEDONIA
REHABILITATION OF 6 HPP IN MACEDONIA
- As the Consultant for Technical Assistance in Project Implementation, AF-Consult provides assistance to KESH-PMU in activities pertaining to implementation of the Dam Safety.
HPP Vrutok (165MW)– Rehabilitation of Hydro-mechanical equipment including dam outlet roller gates, inlet roller gates, penstock aeration valves, trash rake cleaning device, inlet turbine spherical valves, slide gates downstream of turbines and roller gates. Rehabilitation of Electrical equipment including four generators rated 46MW each, replacement of four block transformers, replacement of transformer cables and replacement of regulation transformers. Gorna Radika channel rehabilitation, Toljane tunnel rehabilitation, Intake channel SharskiVodi rehabilitation and Leunovo dam (finishing the dam crest)
HPP Raven (21MW) – Rehabilitation of Hydro-mechanical equipment including turbines A, B and C revitalization of bearing lubrication system, water chamber roller gates refurbishment and Gates downstream of turbines refurbishment. Replacement of main 35 kV transformers
HPP Vrben (12.8MW) – Rehabilitation of Hydro-mechanical equipment including replacement of surge chamber butterfly valve, surge chamber HSS, new cleaning device and slide gate, replacement of butterfly valve downstream of turbines and Butterfly valves at turbine outlet
HPP Spilje (84MW) dam grout curtain rehabilitation
Project financed by KfW.
JSC ELEM (Macedonian Power Plants).
Address of Client: 11 Oktomvri 9, Skopje 1000, North Macedonia
Main scope of services:
- Critical review of available documentation, surveys, investigations, studies;
- Preparation of inception report;
- Preparation of overall tender documentation;
- Monitoring of project implementation;
- Provision of quality control services;
- Monitoring and control of project progress and costs;
- Monitoring of environmental and social impacts during project implementation and start-up of operation.