ENGINEERING CONSULTANCY SUPPORT FOR IMPLEMENTATION OF NEWLY PROPOSED SUBSTATION IN TIRANA CENTRAL
OSHEE Sustainability – Technical Advisor Services
The project encompasses the following key components:
- Design of the underground substation, adhering to international engineering standards and local regulations.
- Procure necessary equipment, materials, and services for the construction of the substation.
- Comprehensive supervision of the construction process to ensure quality, safety, and timely completion.
Project financed by EBRD loan.
OSHEE
Gjergj Fishta Boulevard Nr. 88/1, 1023 Tirana, Albania
Enkeleda Bonati Enkeleda.Bonati@oshee.al
The Consultant has been assigned to provide technical assistance to OSHEE for Construction of a new 110/20kV Substation located near Skanderbeg Square, City of Tirana. The proposed substation will be an underground facility with high voltage gas-insulated switchgears and 3 operational transformers with space for 1 reserve transformer.
The scope of works included the participation in the following tasks:
Design Support
- Tendering and Procurement support
- Assistance with the establishment of the PIU
- Staffing
- Establishment of PIU Operating Procedures particular to the EBRD Project
- Procurement Support
- ESAP Implementation Support
- Onsite Implementation Monitoring & Evaluation (M&E) Support
- Commissioning
- Services during Defect Notification Period and Closure of Project
- Assistance with compliance & reporting obligations under the financing documents
- Conditions Precedent
- Covenants, Reps & Warranties
- Preparing disbursement requests
- Project Accounts and Audits
Reporting in accordance with the Financing Documents