DEVELOPMENT OF 30 MW WIND POWER PLANT PERUN – STUDY FOR COMPLIANCE OF WPP PERUN WITH THE MACEDONIAN TRANSMISSION AND DISTRIBUTION GRID CODE

DEVELOPMENT OF 30 MW WIND POWER PLANT PERUN – STUDY FOR COMPLIANCE OF WPP PERUN WITH THE MACEDONIAN TRANSMISSION AND DISTRIBUTION GRID CODE

DEVELOPMENT OF 30 MW WIND POWER PLANT PERUN – STUDY FOR COMPLIANCE OF WPP PERUN WITH THE MACEDONIAN TRANSMISSION AND DISTRIBUTION GRID CODE

DEVELOPMENT OF 30 MW WIND POWER PLANT PERUN – STUDY FOR COMPLIANCE OF WPP PERUN WITH THE MACEDONIAN TRANSMISSION AND DISTRIBUTION GRID CODE

The Consultant has been assigned to prepare a Compliance Study for Wind Power Plant (WPP) Perun, aiming to analyze the capabilities of the Wind Turbine Generators (WTGs) in WPP Perun against the requirements from the Transmission (1) and Distribution (2) Grid Codes applicable in Macedonia for the connection of Wind Farms (WF) at 110 kV being in ownership of the Distribution Grid Operator.

Interenergo d.o.o.

Tivolska cesta 48,

1000 Ljubljana, Slovenija

T: + 386 (0)1 6203 700

Mr. Jernej Kete,

e-mail: Jernej.Kete@internergo.si

 

Activities performed:

  • Steady-state analysis
  • Dynamic simulations
    • Transient stability
    • Short-term frequency
    • Voltage stability
  • Power Quality
    • Harmonic
    • Flicker

Software used: PSS/E and PSS Sincal

Date:
Colenco.net
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.