DEVELOPMENT OF 30 MW WIND POWER PLANT PERUN – STUDY FOR COMPLIANCE OF WPP PERUN WITH THE MACEDONIAN TRANSMISSION AND DISTRIBUTION GRID CODE
DEVELOPMENT OF 30 MW WIND POWER PLANT PERUN – STUDY FOR COMPLIANCE OF WPP PERUN WITH THE MACEDONIAN TRANSMISSION AND DISTRIBUTION GRID CODE
The Consultant has been assigned to prepare a Compliance Study for Wind Power Plant (WPP) Perun, aiming to analyze the capabilities of the Wind Turbine Generators (WTGs) in WPP Perun against the requirements from the Transmission (1) and Distribution (2) Grid Codes applicable in Macedonia for the connection of Wind Farms (WF) at 110 kV being in ownership of the Distribution Grid Operator.
Interenergo d.o.o.
Tivolska cesta 48,
1000 Ljubljana, Slovenija
T: + 386 (0)1 6203 700
Mr. Jernej Kete,
e-mail: Jernej.Kete@internergo.si
Activities performed:
- Steady-state analysis
- Dynamic simulations
- Transient stability
- Short-term frequency
- Voltage stability
- Power Quality
- Harmonic
- Flicker
Software used: PSS/E and PSS Sincal
Category:
Date:
June 10, 2025