CONSULTANCY SERVICES FOR CONSTRUCTION OF A NEW 400 KV SINGLE CIRCUIT TRANSMISSION LINE AND EXTENSION OF SUBSTATIONS KRAGUJEVAC 2 AND KRALJEVO 3
CONSULTING SERVICES FOR THE IMPLEMENTATION OF OPEN PROGRAMME EXTENSION OF THE TRANSMISSION NETWORK II, EBRD COMPONENTS (C1A AND C2A)
The main objective of the project is with the support of the Consultant to raise the capacity of regional power transmission through the new transmission lines, to raise the security and quality of power supply, while at the same time avoiding greenhouse gas emissions through the reduction of technical losses.
The project comprises of:
- Construction of a new 400 kV single circuit transmission line between the substations Kragujevac 2 and Kraljevo 3, line length 59 km;
- New construction of 400/220 kV Kraljevo 3 substation for extension of the 220/110 kV Kraljevo Substation;
- Extension of 400 kV Kragujevac 2 Substation in by one 400 kV line feeder.
Project financed by KFW.
Client Reference contact:
Branko Jaksic
Deputy Project Manager
Kneza Milosa 11, Belgrade, Serbia
Address of Client: Kneza Milosa 11, Belgrade, Serbia
Main scope of services:
- Preparation of technical specifications for TL and SS;
- Preparation of corresponding tender documentation in line with KfW Procurement rules and procedures;
- Preparation of Contracts;
- Assistance in tendering procedure;
- Assistance in Contract negotiations;
- Provision of communication and visibility services;
- Supervision of construction – FIDIC engineer services.