PREPARATION OF TECHNICAL SOLUTIONS, CONCEPTUAL DESIGN FOR 25 MW PVPPs
DESKTOP PRE-FEASIBILITY STUDY FOR WIND POWER ESTIMATION FOR 150 MW WIND POWER PARK CONNECTED TO 110 KV TRANSMISSION NETWORK
The objective of this assignment is to provide support and assistance during the preparation of the proposal for open procedure for awarding contract for right to use a premium for electricity generated from photovoltaic power plants.
Main scope of services:
- Support in the preparation of bidding documents,
- Performance of location assessment,
- Preparation of conceptual layout of the PVPP,
- Performance of energy yield assessment,
- Determination of possible installed capacity,
- Grid connection analysis.
Category:
Date:
June 3, 2025