FEASIBILITY STUDY FOR RECONSTRUCTION OF SHPP LIPKOVO (0.69MW) AND SHPP GLAZNJA (2.07MW)
FEASIBILITY STUDY FOR RECONSTRUCTION OF SHPP LIPKOVO (0.69MW) AND SHPP GLAZNJA (2.07MW)
The main objective of the assignment is to provide analysis and data to justify and accordingly plan the reconstruction of the SHPP Lipkovo and SHPP Glaznja.
Power Plants of Macedonia (ELEM), North Macedonia
Main scope of services:
- Preparation of dam analysis;
- Preparation of water resources analysis;
- Preparation of financial and commercial analysis;
- Preparation of ESIA Study.