The objective of this study was to analyze data for prospective investment in a small hydro power plant with installed power of 7,9 MW, installed flow 240m3/s, net head 4m and Pit turbine type.
PRO ARM Ltd, Bulgaria
Main scope of services:
- Preparation of feasibility study, including:
- Technical analysis;
- Cost-benefit analysis;
- Financial investment analysis;
- ESIA study.