The main objective of this assignment was to provide consultancy services that would ensure proper procurement and implementation of works for construction of 110kV switchyard, whereas all activities preceding the tendering procedure have been successfully completed by 2016.
Project financed by EBRD.
Address of Client: 11 Oktomvri 9, Skopje 1000, North Macedonia
JSC ELEM (Plants of North Macedonia).
Main scope of services:
- Preparation of design for 110kV switchyard, design for 110kV in-out OHTL connection to the grid;
- Preparation of study for Power Network Analysis and development with PSS/E software;
- Preparation of ESIA study for 110kV in-out connection to the grid;
- Preparation of tender documents;
- Assistance in tendering, evaluation, contracting process;
- Works supervision.