The objective of this assignment is for the Consultant to provide the Investor with all the necessary relevant information before proceeding with developing and constructing a wind power plant.
Main scope of services:
- Analysis and preparation of Wind Farm model with WaSP CfD wind flow modelling on the existing land plot for obtaining best possible, optimum solution of wind farm, considering maximization of production, minimization of uncertainties, land issues and WTG costs for the purpose of providing accurate and reliable results.
Software used: WaSP CfD