TECHNICAL DUE DILIGENCE – REVIEW OF DOCUMENTATION AND SITE INSPECTION FOR PV DJOLE
TECHNICAL DUE DILIGENCE – REVIEW OF DOCUMENTATION AND SITE INSPECTION FOR PV DJOLE
The scope of works comprises technical (covering all engineering, environmental and social disciplines) review of complete permitting procedures and related designs, studies, examinations for 9 PVPPs in Macedonia.
The Consultant will employ to conduct technical due diligence on the nine PV plants. The review will encompass five key tasks, focusing on the following key areas:
Task 1: Review of Permitting Procedure
- Examination of the permitting procedures for all nine PV plants and their associated infrastructure
- Overview and summary of current regulations governing PV power plants, including grid connection, environmental considerations
- Detailed summary of all issued permits, conditions, and approvals
Task 2: Review of Design, Studies, Plans and Examinations, including:
- Initial concept, infrastructural, and urbanistic designs and plans
- Main design documents
- Detailed and execution design documents
- As-built design documents
Task 3: Review of Records, Documents and Measures related to Operation Phase, including:
- Preventive maintenance records and reports
- Documentation and inspection reports related to fire prevention measures
- Records of emergency plans and drills conducted at the plants
- Occupational health and safety (OH&S) records and reports
Task 4: Land Plots Review
Task 5: Site Inspection