PREPARATION OF A REVISED STUDY OF THE HYDROPOWER SYSTEM “GORNJA DRINA”

PREPARATION OF A REVISED STUDY OF THE HYDROPOWER SYSTEM “GORNJA DRINA”

PREPARATION OF A REVISED STUDY OF THE HYDROPOWER SYSTEM “GORNJA DRINA”

PREPARATION OF A REVISED STUDY OF THE HYDROPOWER SYSTEM “GORNJA DRINA”

The objective of this assignment is to provide additional information for possible investment in the hydropower system “Gornja Drina”.

Hydroelectric power system Gornja Drina
19 Nemanjina Street, Foca
R. Srpska

Main scope of services:

  • Preparation of a regional hydrological study of the Gornja Drina basin;
  • Preparation of hydraulic and energy analysis;
  • Preparation of optimization analysis;
  • Preparation of analysis of economic profitability;
  • Revision of other available studies.

 

Category:
Date:
Colenco.net
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.