PRE-FEASIBILITY STUDY FOR NEW TPP NEGOTINO WITH COAL FROM THE NEGOTINO MINE
PREPARATION OF PRELIMINARY DESIGN AND BIDDING DOCUMENTS FOR INSTALLATION OF SCADA SYSTEM IN THE CITY OF KHARKIV
The objective of the Pre-feasibility Study is to explore the possibility of building a thermal power plant TPP Negotino that will use coal from potential coal mine Negotino with an annual capacity up 2.000.000 t (with surface and underground exploitation) and exploitation reserves of 50.000.000t (41 Mt underground and 9Mt surface mining with ).
The output should yield results concerning regular production cost of electricity (Leveled cost of electricity) during the entire service life of 30 years, which should be compared to the production cost of electricity from the remaining capacity of ELEM.
JSC ELEM, Macedonia
Main scope of services:
- Preparation and delivery of Introductory report;
- Market overview and market assessment;
- Definition of alternatives and technical solutions;
- Proposal of optimal option for location of TPP Negotino 2, taking into account the characteristics of the area where Negotino mine is planned, as well as the transport of coal and the connection to the grid;
- Performance of Environmental impact assessment;
- Preparation of Economic and financial analysis;
Category:
Date:
June 11, 2025