EDACS International dooel

EDACS International dooel

EDACS International dooel

DESKTOP PRE-FEASIBILITY STUDY FOR WIND POWER ESTIMATION FOR 150 MW WIND POWER PARK CONNECTED TO 110 KV TRANSMISSION NETWORK

The assignment is comprised of four main tasks for studying and developing a wind power plant project. The successful completion of all tasks will contribute to the realization of an efficient and sustainable wind power plant.

Main scope of services:
Task 1: Identifying and mapping the wind energy potential of the proposed site
Task 2: Microscale wind flow modeling and preliminary annual energy production
Task 3: Layout optimization and microsite
Task 4: Preliminary energy yield assessment of wind resource SCADA requirements

Category:
Date: