The European Bank for Reconstruction and Development (EBRD) and the Government of North Macedonia have agreed to cooperate on the regulatory and legal aspects of a programme to support solar and wind power in the country. Within this context, the…
The Consultant supporting the PEA is responsible for managing the Project in its role as FIDIC Engineer. T The Project concerns the implementation of a 59 km long 400 kV transmission Line between the substations Kragujevac 2 and Kraljevo 3…
HPP Dabar, Technical, Financial and Legal Consulting Services for drafting Contracts for Completion of HPP Dabar Project scope Data collection and analysis Project Due Diligence Preparation of Project documentation Due Diligence Report Support in the selection of hydro-mechanical, mechanical and…
Assistance for the ESIA Pre-Construction planning Implementation Monitoring and Reporting Assistance in supervision of the implementation phase Assistance in site supervision, monitoring and reporting Specific tasks related to implementation of Contracts under the Project Testing, commissioning and operational acceptance Construction…
The scope of the services covers: feasibility studies priority investment plans, technical specifications and tender documents, procurement and project management (PIU) support during implementation. The project was financed by EIB.
Technical Due Diligence of Hydro Seta HPP in Albania Technical Due Diligence of 4 Small Hydro Power Plants in Macedonia Feasibility study for reconstruction of SHPP Glaznja and SHPP Lipkovo Feasibility Study for a prospected small hydro power plant on…
The purpose of this particular assignment is to perform all the necessary supervisory and consultancy services during the construction of the facility PVPP Oslomej with installed power of 10MW. The Consultant operates in the name of the Project’s Investor in…
On request of a private Investor, we provided services and step-by–step guidelines for implementation of the project to the relevant project stakeholders, in order to deliver the agreed project outputs. Technical documentation review Preliminary and Main Design Infrastructure and geotechnical…
The overall objective of this assignment is to prepare the Feasibility Study with Preliminary Design for the Solar Plant, which will, among all other as required for this kind of documentation, provide the following: Site locations assessment with solar resource…