FRONT END ENGINEERING DESIGN (FEED) OF ABUJA INDEPENDENT POWER PLANT PROJECT ABUJA, FCT, 1350MW IN GWAGWALADA, NIGERIA
FRONT END ENGINEERING DESIGN (FEED) OF ABUJA INDEPENDENT POWER PLANT PROJECT ABUJA, FCT, 1350MW IN GWAGWALADA, NIGERIA
The main objective of the assignment was to explore and acquire basic data and information necessary to develop the conceptual design for:
- Abuja power plant substation and grid interconnection and
- Evacuation of power through transmission line and connection to the National grid.
Nigerian National Petroleum Corporation
NNPC/Gas Power Investment Company GPIC
Main scope of services:
- Revalidation and advise on the most appropriate tie-in location at the grid to enable smooth evacuation of generated power from the power plant;
- Review of the survey and confirmation or recommendation of options for the transmission line integration route and associated substations upgrade;
- Preparation of preliminary design for the transmission line integration works and the associated substations switchgear upgrade;
- Preparation of tentative bill of quantities for the power plant, balance of plant, transmission line and the substations;
Preparation of network analysis.