ADDITIONAL SERVICES FOR IMPLEMENTATION OF SECOND POWER TRANSMISSION PROJECT:

ADDITIONAL SERVICES FOR IMPLEMENTATION OF SECOND POWER TRANSMISSION PROJECT:

ADDITIONAL SERVICES FOR IMPLEMENTATION OF SECOND POWER TRANSMISSION PROJECT:

ADDITIONAL SERVICES FOR IMPLEMENTATION OF SECOND POWER TRANSMISSION PROJECT:

15 SUBSTATIONS (750KV, 330KV AND 220KV)

Phase 2 – reconstruction of 15 substations of Central Power System (PS), Western PS and Northern PS  with purpose to implement Substation Automation Systems (SAS) with replacement of primary and secondary equipment, integration of switching and communication equipment, relay protection and automation devices, monitoring subsystems, other main and auxiliary subsystems in the scope necessary to make control of technological processes at substations possible from remote control centers without permanent presence of personnel at substations.

Project financed by the World Bank.

SE NPC “Ukrenergo”
Address: 25, Symona Petliury Str.,
Kyiv, 01032, Ukraine
Attention : Mr. Viktor Lysykh
Telephone: +38-044-238-30-14
Facsimile: +38-044-238-39-81
E-mail: office@nec.energy.gov.ua

 

 

Main scope of services:

  • Participation in preparation of Feasibility studies and
  • Preparation of Bidding documentation for:
    • Western PS (Package UE/1C): Six 330kV and 220kV substations;
    • Central PS (package UE/1D): Five 330kV substations;
    • Northern PS (Package UE/1E): Four 750kV and 330kV substations.

 

Date:
Colenco.net
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.