Supervisory activities on the construction of the Photovoltaic Power Plant Oslomej 1, with power capacity of 10 MW
Supervisory activities on the construction of the Photovoltaic Power Plant Oslomej 1, with power capacity of 10 MW
On 24.09.2021 the authorized experts from Colenco performed regularly supervision activities on the construction of the Photovoltaic Power Plant Oslomej 1. The progress of construction of the PV plant is going in accordance with the programme of performance. The drainage system is finalized, the racking structure of the PV panels is also finalized and more than 80% of PV panels are also mounted.
The investor of the PV plant is JSC POWER PLANTS OF NORTH MACEDONIA
The EPC Contractor is GIRIŞIM ELEKTRIK TAAH. TIC. VE SAN. A.Ş, Turkey
The Consultant and supervision is COLENCO Ltd. Skopje