skip to Main Content

Supervisory activities on the construction of the Photovoltaic Power Plant Oslomej 1, with power capacity of 10 MW

Supervisory activities on the construction of the Photovoltaic Power Plant Oslomej 1, with power capacity of 10 MW

On 24.09.2021 the authorized experts from Colenco performed regularly supervision activities on the construction of the Photovoltaic Power Plant Oslomej 1. The progress of construction of the PV plant is going in accordance with the programme of performance. The drainage system is finalized, the racking structure of the PV panels is also finalized and more than 80% of PV panels are also mounted.

The investor of the PV plant is JSC POWER PLANTS OF NORTH MACEDONIA

The EPC Contractor is GIRIŞIM ELEKTRIK TAAH. TIC. VE SAN. A.Ş, Turkey

The Consultant and supervision is COLENCO Ltd. Skopje

 

Back To Top
rolex replica watches
Roelx Daytona Replica
Replcia Rolex Day-Date Watches
Rolex datejust replica
Replica Rolex Cellini watches