skip to Main Content

International mission in the Albania Power Recovery project

International mission was held in the Albania Power Recovery project with Darko Risteski, discussing with PMU about Project’s progress, possibilities for project enhancement and its extension and on-site monitoring situation. A special attention was given to the monitoring for the implementation of the 110/20kV Substation Kombinat where the Consultant suggested solutions that would enhance the works quality and timely completion.

 

Back To Top
rolex replica watches
Roelx Daytona Replica
Replcia Rolex Day-Date Watches
Rolex datejust replica
Replica Rolex Cellini watches
Ulysse Nardin Replica Watches Chopard Replica Roger Dubuis Replica Sinn Replica Tudor Replica Swiss Replica Watches Omega Replica Omega Seamaster Planet Ocean Replica Omega Seamaster 300M Replica Omega Aqua Terra Replica Watches Breitling Replica Watches replica watches 3M Vehicle Wraps Avery Dennison Vinyl Wrap Nas Car Wraps FlexiShield Car Wrap Hexis Vinyl Wraps Vinyl Wraps