skip to Main Content

Consultant services for MEPSO Rehabilitation and Control Project

The project was financed by EBRD loan.
The project objectives include four components:

  1. Rehabilitation of selected 400 kV and 110 kV existing substations,
  2. Implementation of equipment and software applications for remote supervision of main substations,
  3. Completion of the fiber optic optical ground wire (OPGW) network
  4. Replacement of old sections of 110kV transmission lines.
  • The services included:
  • PIU support;
  • Project management;
  • Preparation of tender documents;
  • Training and transfer of know-how;

The project was financed by EBRD loan.

Back To Top
rolex replica watches
Roelx Daytona Replica
Replcia Rolex Day-Date Watches
Rolex datejust replica
Replica Rolex Cellini watches
Ulysse Nardin Replica Watches Chopard Replica Roger Dubuis Replica Sinn Replica Tudor Replica Swiss Replica Watches Omega Replica Omega Seamaster Planet Ocean Replica Omega Seamaster 300M Replica Omega Aqua Terra Replica Watches Breitling Replica Watches replica watches 3M Vehicle Wraps Avery Dennison Vinyl Wrap Nas Car Wraps FlexiShield Car Wrap Hexis Vinyl Wraps Vinyl Wraps