Project: FEASIBILITY STUDY FOR RECONSTRUCTION OF SHPP LIPKOVO (0.69MW) AND SHPP GLAZNJA (2.07MW)
Client: Power Plants of Macedonia (ELEM)
Country of operation: North Macedonia
Project: PREPARATION OF TENDER DOCUMENTATION FOR PUBLIC TENDER AIMED AT DESIGNING, CONSTRUCTION, OPERATING AND MAINTAINING THE CEBREN HYDROPOWER
Client: LEXIA AVVOCATI
Country of operation: North Macedonia
Project: TECHNICAL DUE DILIGENCE – REVIEW OF DOCUMENTATION AND SITE INSPECTION – SHPPS BOSHAVA
Client: Interenergo, d.o.o.
Country of operation: North Macedonia
Project: FINANCIAL ASSESSMENT FOR POTENTIAL INVESTMENT IN SMALL HYDRO POWER PLANTS IN N.MACEDONIA AND MONTENEGRO
Client: Confidential
Country of operation: Montenegro / North Macedonia
Project: FINANCIAL ASSESSMENT FOR POTENTIAL INVESTMENT IN SMALL HYDRO POWER PLANTS IN N.MACEDONIA AND MONTENEGRO
Client: Confidential
Country of operation: Montenegro
Project: HPP DABAR, TECHNICAL, FINANCIAL AND LEGAL CONSULTING SERVICES FOR DRAFTING CONTRACTS FOR COMPLETION OF HPP DABAR 160MW
Client: HPP Dabar
Country of operation: Republic of Srpska
Project: PRE-FEASIBILITY STUDY FOR VARDAR VALLEY
Client: JSC ELEM (Macedonian Power Plants).
Country of operation: North Macedonia
Project: CONSULTANT SERVICES FOR THE PROJECT FOR REHABILITATION OF BULGARIAN HYDRO POWER FACILITIES
Client: NEK EAD
Country of operation: Republic of Bulgaria
Project: HPP BOSKOV MOST – Design and Construction of a 70 MW Hydropower plant
Client: JSC ELEM (Macedonian Power Plants).
Country of operation: North Macedonia
Project: REHABILITATION OF 6 HPP IN MACEDONIA – Rehabilitation of Dam monitoring systems for 4 Dams Mavrovo, Spilje, Globocica and Tikves
Client: JSC ELEM (Macedonian Power Plants).
Country of operation: North Macedonia
Project: DEVOLL HPP 240MW
Client: Devoll Hydropower
Country of operation: Albania
Project: TECHNICAL ASSISTANCE IN PROJECT IMPLEMENTATION – DAM SAFETY PROJECTS
Client: KESH
Country of operation: Albania
Project: ENVIRONMENTAL EXPERT AND INDEPENDENT ENGINEER FOR THE EPS SMALL HYDRO POWER PLANTS PROJECT (20MW) IN SERBIA
Client: EPS
Country of operation: Serbia
Project: TECHNICAL DUE DILIGENCE OF HYDRO SETA HPPs (13MW)
Client: Hydro Seta Sh.p.k
Country of operation: Albania
Project: FEASIBILITY STUDY FOR RECONSTRUCTION OF SHPP LIPKOVO (0.69MW) AND SHPP GLAZNJA (2.07MW)
Client: Power Plants of Macedonia (ELEM)
Country of operation: North Macedonia
Project: FEASIBILITY STUDY FOR RECONSTRUCTION OF SHPP LIPKOVO (0.69MW) AND SHPP GLAZNJA (2.07MW)
Client: Power Plants of Macedonia (ELEM)
Country of operation: North Macedonia
Project: TECHNICAL DUE DILIGENCE FOR 4 SMALL HYDRO POWER PLANT PROJECT:
SHPP Pena 82 16.8MW, SHPP Pena 84 28.9MW, SHPP Pena 85 24.65MW and SHPP Sheliche 91 15.73MW
Client: Gravis Hydro, Macedonia
Country of operation: North Macedonia
Project: FEASIBILITY STUDY FOR A PROSPECTED SMALL HYDRO POWER PLANT (7.9MW) ON THE RIVER MARICA IN THE REPUBLIC OF BULGARIA
Client: PRO ARM Ltd,
Country of operation: Republic of Bulgaria
Project: PREPARATION OF A REVISED STUDY OF THE HYDROPOWER SYSTEM “GORNJA DRINA”
Client:
Country of operation: Bosnia and Herzegovina
Project: TECHNICAL ASSISTANCE IN PROJECT IMPLEMENTATION – DAM SAFETY PROJECTS
Client:
Country of operation: